Building Assessments provided by McCownGordon

Retro-Commissioning

Our Commissioning Services

Retro & Existing Building Commissioning in Dallas-Fort Worth

Bring Your Building Back to Life

Bringing an existing building to peak functionality based on its current use is a task not just any company can take on. Engaging with McCownGordon’s retro-commissioning team in Dallas-Fort Worth means we can identify and correct any inefficiencies in your building that could potentially be wasting thousands—or even tens of thousands—of dollars annually.

READ MORE ABOUT Our COMMISSIONING services

Retro-Commissioning at McCownGordon is designed to reduce building energy loss.

Identify and meet energy efficiency and performance goals through our extensive property review against comparable property benchmarks.

 

Retro-commissioning can prove to be the most important building efficiency process implemented for your buildings.

Most waste in commercial buildings is invisible in day-to-day operations, similar to what happens under the hood of a car. From broken dampers/valves or HVAC system design problems to unwarranted human interaction with temperature controls can create significant energy waste, even leading to simultaneous heating and cooling.

Our specialized, experience commissioning team can create a detailed engineering evaluation focused on energy savings, including low-cost or no-cost energy saving measures (generally over a 2-year payback period). Commissioning an existing building goes beyond day-to-day maintenance by addressing high energy costs and resolving operational problems. This includes an assessment of existing mechanical and HVAC systems, lighting, service water systems and automatic controls.

McCownGordon Commissioning

Key Benefits

  • Improved Occupant Comfort 
  • Lower Operational Costs 
  • Improve Net Operating Income 
  • Reduced Utility Consumption 
  • Increased Asset Value 
  • Increased Equipment Life Expectancy 
  • Improve Indoor Air Quality 
  • Improved building systems documentation 

5 Step Retro-Commissioning Process

One: Benchmarking & Planning

 

Two: Investigating & Testing

 

Three: Analysis & Priorities

Four: Implementation of Savings Measures

 

Five: Competition & Close-out

From Our Experts

McCownGordon Commissioning
Questions about Commissioning
Retro-Commissioning at McCownGordon is designed to reduce building energy loss.
construction delivery methods at McCownGordon
Two associates collaborating at a desk
McCownGordon associate building relationship by shaking hands with owner on project site

The first thing we build is relationships.

Tell us about how we can help you. We’d love to learn more about your needs or upcoming project to help bring your vision to reality.

Let’s Build